Ski Resorts News
02/26/2019
The opening of the world’s highest 3S cableway to the Matterhorn glacier paradise in the autumn of 2018 was just the first stage in the realization of a much more far-reaching vision: the creation of a continuous cableway connection between Zermatt and Italy – the so-called “Alpine Crossing”. This crossing will be made possible by the addition of another structurally similar 3S cableway between Testa Grigia and the Matterhorn glacier paradise. The first visitors should be able to make the highest crossing of the Alps in spring 2021.

The submission in the summer of 2018 of the project to construct a cableway link via a 3S cableway made by LEITNER ropeways between the stations at Testa Grigia (Cervinia) and Matterhorn glacier paradise (Klein Matterhorn) generated intensive discussions between Zermatt Bergbahnen AG (ZBAG) and the complainant, the Swiss Foundation for Landscape Conservation (Stiftung Landschaftsschutz Schweiz, or SL). With both sides offering constructive proposals, an agreement has been reached and work can now start on the realization of an "Alpine Crossing" between Zermatt and Cervinia (Italy).
Within the framework of these amicable talks, ZBAG and the SL signed an accord taking appropriate account of the interests of both parties.
For its part, the SL agrees that where the legal proceedings covering concession and planning approval are concerned, it will not object to the anticipated granting of concession and planning approval by the Federal Office of Transport for the LEITNER ropeways 3S cableway between Testa Grigia and the Matterhorn glacier paradise. In return, ZBAG affirms its commitment to promote quality tourism, provide a high-calibre experience of the mountains and natural surrounding and maintain a respectful approach to the environment.
Furthermore, ZBAG also pledges to remove the existing materials cableway between Cime Bianche in Italy and the Klein Matterhorn, plus the cross-border lift which is currently a component of the summer ski area, and restore the sites to their original condition. This is to be done upon receipt of the operating licence from the Federal Office of Transport. Agreement was also reached on the issues of the outside lighting of the mountain station and the colour scheme for the valley station with respect to improved integration of the buildings into the surrounding landscape.
The landscape is to be improved
It is hoped that opening up the design and use of the existing buildings to an architectural competition will improve the appearance of the landscape on Testa Grigia and integrate the development better into the surrounding mountain scenery and other natural features. As soon as ZBAG has produced the overall concept for the future infrastructure, design and operations on Klein Matterhorn, it will be presented to the SL so that mutually agreeable solutions can be arrived at where these are concerned too.
Scheduled for commissioning in 2021
Construction work is set to begin without delay on the new 3S cableway which will connect Zermatt with Italy all year round and form the highest Alpine crossing. The "Alpine Crossing" is scheduled to go into service in 2021.
Latest Resort News
Helmissimo: A New 10-Seater Gondola Set to Transform the 3 Zinnen Dolomites Ski Area
The 3 Zinnen Dolomites ski area in South Tyrol, Italy, is preparing for a major infrastructure upgrade ahead of the 2026/2027 winter season. The new HELMISSIMO 10-seater premium gondola in Versciaco will bring faster access to Monte Elmo (Helm), increase lift capacity and improve the overall skiing experience.
11/06/2026
La Clusaz Unveils New Six-Seater Balme Chairlift for the 2026–2027 Ski Season
La Clusaz, one of the most popular ski resorts in the French Alps, is preparing a major upgrade to its mountain infrastructure with the installation of a brand-new six-seater detachable chairlift in the iconic Balme sector. The new lift, built by French manufacturer POMA, is set to transform access to one of the resort's most spectacular high-altitude skiing areas for the 2026–2027 winter season.
11/04/2026
L’Alpe du Grand Serre Saved: 30-Year Deal and Investment
L’Alpe du Grand Serre, one of the oldest ski resorts in the French Alps, has been saved from permanent closure after signing a 30-year operating agreement with SATA Group. The deal, signed on 30 September 2026, secures the resort’s long-term future and paves the way for its reopening on 19 December 2026. With investments of up to €17 million planned, the resort near Grenoble is preparing for a new chapter in its history.
11/03/2026